{ "homeurl": "http://nitroproenergy.com", "resultstype": "vertical", "resultsposition": "hover", "itemscount": 4, "imagewidth": 70, "imageheight": 70, "resultitemheight": "auto", "showauthor": 0, "showdate": 0, "showdescription": 1, "charcount": 3, "noresultstext": "No results!", "didyoumeantext": "Did you mean:", "defaultImage": "http://mehranservices.com/wp-content/plugins/ajax-search-pro/img/default.jpg", "highlight": 0, "highlightwholewords": 1, "openToBlank": 0, "scrollToResults": 0, "resultareaclickable": 1, "autocomplete": { "enabled": 0, "googleOnly": 0, "lang": "en", "mobile": 0 }, "triggerontype": 1, "triggeronclick": 1, "triggeronreturn": 1, "triggerOnFacetChange": 1, "trigger": { "delay": 300, "autocomplete_delay": 310 }, "overridewpdefault": 0, "override_method": "post", "redirectonclick": 0, "redirectClickTo": "results_page", "redirect_on_enter": 0, "redirectEnterTo": "results_page", "redirect_url": "?s={phrase}", "settingsimagepos": "right", "settingsVisible": 0, "hresulthidedesc": "0", "prescontainerheight": "400px", "pshowsubtitle": "0", "pshowdesc": "1", "closeOnDocClick": 1, "iifNoImage": "defaultimage", "iiRows": 2, "iiGutter": 5, "iitemsWidth": 200, "iitemsHeight": 200, "iishowOverlay": 1, "iiblurOverlay": 1, "iihideContent": 1, "loaderLocation": "auto", "analytics": 0, "analyticsString": "", "show_more": { "url": "?s={phrase}", "action": "ajax" }, "mobile": { "trigger_on_type": 1, "trigger_on_click": 1, "hide_keyboard": 0 }, "compact": { "enabled": 0, "width": "100%", "closeOnMagnifier": 1, "closeOnDocument": 0, "position": "static", "overlay": 0 }, "animations": { "pc": { "settings": { "anim" : "fadedrop", "dur" : 300 }, "results" : { "anim" : "fadedrop", "dur" : 300 }, "items" : "fadeInDown" }, "mob": { "settings": { "anim" : "fadedrop", "dur" : 300 }, "results" : { "anim" : "fadedrop", "dur" : 300 }, "items" : "voidanim" } }, "autop": { "state": "disabled", "phrase": "", "count": 10 } }

Timeline

Libya Operations Base

Ahwaz Operations Base

2015 Purchased a 15000 m² yard to equip as land operation base in Libya.

Second Vessel Stimulation

Stimulation by Genesis

Aug. 2014 The second stimulation vessel- conducted operation.

New Office

New Office

March 2014 Expanded its HQ office. Moved its head quarter to much larger office.

Third Operations Base

Third Operations Base

Dec. 2013 Expansion of operations base in Calgary by adding  a  7500 m² yard.

Coiled Tubing

First Coiled Tubing

Oct. 2012 Nitro Pro Energy Services Inc Coiled Tubing operations under a contract.

Well Testing

First Well Testing

Sep. 2012   Commenced Well Testing Services Project.

Calgary Second Base.

Kish Island Base-48.

March 2011 Established a second base of 5500 m² in Calgary.

Huge Expansion

Huge Expansion

2010 Expansion of all well services, increasing capacity in operations, growth of investment, Human resources 500 people and operations bases.

IDS Contract

IDS Contract

May. 2010 Nitro Pro Energy Services Inc was awarded the Integrated Drilling Services contract.

Second Joint Venture

UMS: Second Joint Venture

Sep. 2009 Formed a joint venture with the Canadian United Safety.

First Stimulation Job

First Stimulation Job

Jun. 2009 Nitro Pro Energy Services Inc Vessel Conducted the first stimulation Job.

Stimulation Vessel

Mehran Explorer

2008 Rebuilt the first Nitro Pro Energy Services Inc stimulation vessel.

Calgary Base.

Kish Island Base-47.

2007 Established a 3800 m² yard in Calgary to serve as operations base.

First Joint Venture

First Joint Venture

2006 Formed a joint venture in order to offer Slickline, Well Head and Completion services.

First Cementing

First Cementing

Jan. 2005 Performed our first ever field operations, cementing.

Establishment

Establishment

Aug. 2004 Nitro Pro Energy Services Inc was founded as a services company employing 20 people.

CONTACT US

4220 Worcester Dr Sw, Calgary, AB T3C 3L4, Canada

1-403-879-7464

1-403-246-0767

1-403-686-2076

info@nitroproenergy.com